ADU financing. A plan for the whole property.

Additional living space starts with the property you already have. Bring the proposed design, intended use and project budget into one financing conversation.

Primary house and a smaller detached ADU Simple front views of a main house and a smaller accessory dwelling on the same property. Illustrative only, not a permitted site plan.

Primary home Additional living space One property

Illustrative property relationship · not a permitted site plan

ADU Configurations

Detached

A separate dwelling on the same parcel. Include access, site preparation and utility work in the project plan.

Attached

Additional living space connected to the primary home. Clarify where the addition joins the existing building.

Conversion

Independent living space created within an existing structure, such as a garage. Confirm the proposed use and necessary work.

Budget beyond the building.

  • Design & Construction Documents
  • Permit & Impact Fees
  • Site Utility Upgrades
  • Foundation & Shell Construction
  • Interior Finishes & Fixtures
  • Landscaping & Hardscape Restoration
  • Contingency for changes or unexpected work
  • Holding & Financing Costs

Separate quotes from assumptions and confirm what the contractor price includes. Check local zoning, approvals and proposed use with the relevant authority and project professionals.

Educational review · October 8, 2026

Compare the loan with the project it must fund.

A proposal needs to fit both the completed property and the dates when cash is due. State the intended occupancy of both dwellings, who owns the land, the complete budget and the first payment deadline. Living in the main house while renting an ADU differs from holding the whole property for investment.

Keep the first mortgage or replace it?

An equity loan or HELOC can add debt while the first mortgage remains. Compare the combined payments, fees and changes after a draw period. A refinance can replace the entire first-mortgage balance; compare its full payment and the amount still owed at the same future date. A longer term can lower a payment without lowering financing expense.

Source: CFPB: equity loans and HELOCs.

Value, available proceeds and cash timing are different.

Ask whether capacity uses today's value, estimated completed value, or both, and how existing debt is treated. Construction cost does not guarantee an equal increase in appraised value. A product using completed value can still have current-value limits and staged releases. Personal or home-improvement financing is another category to compare. Check the actual security or lien terms, permitted project use, net proceeds and repayment requirements; a no-equity description alone does not establish that a loan is unsecured. These are comparisons, not confirmed Integra products.

For construction financing, confirm first-mortgage treatment and whether permanent financing is part of the transaction or requires a later approval. Use the value-ratio guide and repayment planning guide for those separate methods.

Sources: CFPB: construction loans; Freddie Mac: ADU appraisal.

Record written proposals for the same project and comparison horizon
Record for each proposalQuestion to resolve
Lender, intermediary and productWho controls terms and releases?
Occupancy, property and locationDoes the written proposal fit this actual project?
First mortgage retained or paid offWhich original payment continues, and which balance is replaced?
Value basis and existing debtIs capacity based on current value, completed value or both?
Gross amount, fees and net proceedsHow much can actually pay project invoices?
Rate, adjustments and APR where applicableWhat is fixed, what can change, and which fees are included?
Payments during and after constructionWhich debts overlap, and what changes after a draw period?
Interest and fees over one horizonCompare financing expense separately from principal repaid.
Principal repaid and remaining debtWhat is still owed at the same comparison date?
Release dates and conditionsAre funds available before each invoice deadline?
Own cash, contingency and reservesWhich sources are actually committed?
Maturity, conversion or later refinanceWhat must happen to repay or replace the loan?
ADU income and required evidenceDoes existing or proposed rent count under this program?
Inspection, extension and payoff termsWhat can delays and an early exit cost?

Keep principal repayment, interest expense and remaining debt separate. Do not add overlapping measures into a misleading total cost. For a general comparison, use the financing-proposal guide.

Establish whether ADU rent counts.

Expected rent explains the intended use without necessarily qualifying the borrower. Ask whether the actual proposal accepts income from an existing ADU, a proposed ADU, or neither, and what evidence and limits apply. Renting an ADU while living in the main house does not automatically create eligibility for an investment-property product.

Fannie Mae's posted subject-property guidance permits rental income from one existing ADU only within specified transactions and income limits. Its September 2026 rental-policy update allows early implementation and requires adoption for applications from December 1, 2026. Confirm the lender's implemented policy and appraisal standard. That implementation date is not the origin of all existing ADU limitations. A portfolio lender's projected-rent policy is a separate product rule.

Sources: Fannie Mae: subject-property rental income; September 2026 implementation announcement. Policy reviewed October 8, 2026; recheck before publication.

Match invoice deadlines to actual releases.

A factory deposit, site work, delivery, installation and utilities can follow different contracts. Record each deadline and the written release conditions. An inspection-dependent reimbursement is not cash available before the work. Count a direct lender payment against its invoice once. In this fictional schedule, $50,000 paid straight to a $60,000 factory invoice leaves $10,000 due; with $2,000 borrower cash left, the shortfall is still $8,000. That vendor payment is not another $50,000 of spendable borrower cash.

Confirm the actual lender's handling of factory invoices, initial releases, inspections and work already started. A program-specific advance rule is not a universal promise to fund off-site work. Do not count an unawarded grant as committed project cash.

Source: Fannie Mae: HomeStyle Renovation escrow guidance.

Fictional example: a balanced budget, an unfunded calendar.

$240,000 of invoices match $40,000 of borrower cash plus $200,000 of hypothetical loan proceeds. Dates below are fictional. Fees, interest, holdbacks and contingency are excluded. This is not a lender policy or an offer.

Selected fictional checkpoints: work stops at the first $8,000 shortfall on day 35 unless resolved
Day, after listed payments/releasesCumulative fundsCumulative invoicesNet position
35 — initial release and factory deposit$90,000$98,000-$8,000
70 — factory balance and delivery$90,000$170,000-$80,000
75 — next hypothetical release$200,000$170,000$30,000
120 — final invoice, after the day-110 release$240,000$240,000$0

These are selected checkpoints from the full fictional schedule. The project cannot proceed as scheduled from day 35 without an actual solution. Later rows illustrate the mismatch and its $80,000 peak timing gap; they do not assume an overdraft, approved bridge or completed work. The full calendar also shows $5,000 and $30,000 shortfalls on days 90 and 100. Ending at zero does not fund earlier deadlines. Download the full 13-event calendar to inspect every payment and release.

Full 13-event calendar: /downloads/adu-fictional-calendar-2026-10-08.csv

A separate fictional $20,000 overrun raises total costs to $260,000 against $240,000 of funds: a $20,000 budget gap. Recalculate when it is due; adding that gap to the $80,000 timing gap does not determine a new loan amount. Resolve every shortfall with verified cash, approved release changes, negotiated deadlines or revised scope before relying on the schedule.

Blank milestone worksheet

List vendor, amount, deadline, cash available, lender releases, direct vendor payments, evidence, holdbacks and the actual solution for any gap. Blank fields mean information is still needed.

Record the factory and site contracts on one calendar
MilestoneInvoice / deadlineAvailable funds / release conditionsGap / verified solution
Design and permits   
Factory deposit   
Foundation and site   
Factory balance   
Transport and delivery   
Installation and utilities   
Inspection and retention   
Completion and repayment   

Download the blank worksheet (CSV) · Download the fictional calendar (CSV)

Your browser's print action prints selected fictional cash checkpoints and the blank worksheet. Download the full calendar for all 13 events. No information is sent.

Prepare your intended use, ownership, location, mortgage treatment, permit stage, complete budget and payment deadlines in the ADU brief below, or prepare an ADU inquiry.

Website review · Integra's supported audiences, products, role and markets need business confirmation. Sensitive documents belong in an approved later channel.

Put your plans on paper.

Start with the details you know. Your brief carries into the inquiry form; it does not check eligibility or submit a loan application.

Estimated total development cost.

Estimated loan amount required.

Project Brief Summary

Your brief is prepared here. Nothing is sent by this worksheet. Review and send your inquiry on Contact.